An electric-car salesperson once showed me a charging map covered in pins. It looked like India had developed a mild case of technological measles. He zoomed out, smiled and moved to the range slide. What the map did not say was whether the charger behind each pin was powered, compatible, accessible, occupied by a combustion car, trapped inside a closed compound or linked to an app willing to accept payment. A pin is geography. Infrastructure is a successful charging session.
The policy ambition is substantial. The government’s announcement concerning funding for 72,000 public chargers sets out the scale sought under PM E-DRIVE. Later operational guidance for public charging deployment identifies locations such as fuel outlets, stations, parking areas and highway facilities. Those are sensible foundations. The next policy phase must judge networks by reliability, not sanctioned quantity.
Uptime is the number that matters
Drivers do not experience an annual charger total. They experience one machine at 11.20 p.m. with a low battery and a sleeping child. If it fails, the existence of three thousand functioning chargers elsewhere offers limited comfort. Networks should publish connector-level uptime measured independently, excluding long periods when a station is technically online but cannot initiate or sustain a session.
There must be a national reliability standard for publicly subsidised chargers. Operators receiving capital support should meet service levels, maintain a round-the-clock helpline and provide a repair timeline. Repeatedly unreliable sites should lose incentives. Public money should purchase delivered energy and dependable availability, not equipment that looks complete in an inauguration photograph.
Status data should be open enough for navigation apps and vehicle systems to use. Drivers need live information on connector type, power, occupancy, price and recent reliability. Every network demanding its own wallet and app recreates the fragmentation that digital payments had already taught India to avoid. UPI-based guest payment should be mandatory.
Pricing requires clarity. Some operators charge by energy, others by time, and parking fees may arrive separately. Time-based penalties can discourage cars from blocking completed sessions, but they should be disclosed before charging begins. The screen should show the tariff, estimated cost and any idle fee in plain language. Electricity may be invisible; the bill should not be.
Apartment charging is the real mass-market battlefield
Public fast chargers receive attention because they are visible. Most private EV owners should charge slowly where the car spends the night. India’s housing makes that difficult. Apartment residents may not have assigned parking, a nearby meter or permission from the residents’ association. Cables cross common areas, committees fear fire, and the person proposing a charger is asked to fund electrical upgrades for the building.
State building rules should establish a right to install safe charging at an owner’s cost, subject to technical standards. New residential and commercial projects must include conduits, load planning and a meaningful share of EV-ready spaces. “Provision for future charging” should mean installed electrical pathways, not an architect pointing at an empty wall.
Older buildings need audited solutions. Load management can distribute available capacity across vehicles rather than assuming every car charges at maximum power simultaneously. Separate metering can resolve disputes over common electricity. Fire-safety guidance should be specific and evidence-based, because vague fear is easily weaponised by committees that resist any change.
Renters deserve attention. EV policy often imagines a homeowner with private parking and solar panels. Urban India includes tenants who change homes, street-parked vehicles and informal parking arrangements. Fleet and workplace charging may serve some of them, but policymakers should admit that the transition will move unevenly. Subsidising a car does not create a socket.
Highway charging must be designed as a corridor
A charger every specified distance sounds adequate until traffic peaks on a holiday. One or two connectors at a site can create a queue longer than the charging session. Corridor planning must model demand, redundancy and seasonal travel. A failed unit should not strand a route.
Sites need lighting, toilets, food, security and shelter. Drivers spend twenty to forty minutes there; charging infrastructure is also public-space infrastructure. Women travelling at night will not consider an isolated machine behind a shuttered warehouse a viable station, whatever the app says. Accessibility for elderly and disabled users matters too: heavy cables, high kerbs and blocked bays can make technically operational sites unusable.
Power levels should match dwell time. Restaurants and shopping areas can use moderate charging; expressway stops require reliable fast charging. Installing high-rated hardware on an inadequate electrical connection creates an impressive number and disappointing speed. Operators should disclose typical delivered power, not merely the charger’s theoretical maximum.
Interoperability between vehicles and chargers requires continuous testing. Connector standards may be defined, yet software handshakes still fail. Government, automakers and operators should maintain joint test facilities and publish compatibility. The consumer should not mediate a dispute in which the car company blames the charger and the charger company blames the car.
The grid objection is real but often misused
Critics say EVs merely move emissions from tailpipes to power plants. India’s coal-heavy grid means electric driving is not emissions-free, and policymakers should never claim otherwise. But centralised generation can become cleaner over a vehicle’s life, while a petrol engine cannot. EVs also remove local exhaust from crowded streets. Lifecycle outcomes vary by vehicle size, battery and electricity mix, which is an argument for better analysis—not abandonment.
Managed charging can help the grid by shifting demand away from peaks. Time-of-use tariffs should reward overnight or renewable-rich charging. Fleet depots can coordinate schedules. Vehicle-to-grid services may eventually contribute, but we should first master the less glamorous task of making ordinary one-way charging dependable.
Distribution companies need investment and data. Clusters of fast chargers or residential adoption can stress local transformers even when the national energy requirement is manageable. Connection approvals should be standardised, with transparent timelines and charges. Operators cannot build viable networks while negotiating a different bureaucratic maze in every city.
Battery size deserves scrutiny. The industry’s answer to infrastructure anxiety is often a larger pack. That increases price, weight and material use while many owners carry unused range daily. A dense, reliable network allows smaller batteries and more efficient vehicles. Infrastructure is therefore not merely support for EV sales; it shapes the environmental quality of the fleet.
What I would require from public funding
Every subsidised public site should report uptime, successful-session rate, energy dispensed and average repair time. Data should be audited and published in a machine-readable format. Funding should be released in stages: installation, demonstrated operation and sustained reliability. This prevents programmes from counting hardware and disappearing before maintenance begins.
Contracts must budget for several years of service. Chargers are not monuments. Cables wear, screens fail, software changes and payment systems break. Operators with no durable business model should not win tenders merely by quoting the lowest installation price. The cheapest dead charger is expensive street furniture.
Government should also separate the needs of two-wheelers, three-wheelers, buses, trucks and cars. Battery swapping may make sense for some commercial segments; depot charging suits buses; highway megawatt charging will eventually matter for heavy vehicles. A single national charger count conceals these distinct systems.
Automakers have responsibilities. They should integrate live charging information, offer realistic route planning and provide battery preconditioning where needed. Dealers must explain home-installation requirements before accepting a booking. Selling the car first and discovering the customer lacks sanctioned parking later is not an infrastructure strategy.
I remain enthusiastic about India’s EV transition. Electric cars are quiet, efficient and pleasant in traffic. Electric two- and three-wheelers can reduce fuel costs and urban pollution at enormous scale. The policy momentum is real. My frustration comes from watching ambition measured through the easiest variable: how many units were approved or installed.
The driver cares about a harder variable: did charging work tonight? Build policy around that question. Guarantee open payments, truthful status, safe locations and audited uptime. Make apartment charging a right under clear technical rules. Plan corridors for queues and failure, not ideal conditions. Then the pins on the map will begin to mean what salespeople already imply they mean. Until then, the most important accessory in an Indian electric car remains not the fast-charging cable, but a healthy suspicion of icons coloured green.